Glatt GPCG-15 Installation at a pharmaceutical manufacturing company  Pharmaceutical in Chestnut Ridge, NY.

CNE managed a portion of the installation. Assisted the project manager and the riggers with proper placement of the fluid bed components. Directed the electricians on all wiring of field devices and motor controls. We handled all of the control wiring inside the control panel and to all the field devices (including all pneumatic connections).

Once the wiring was complete, CNE executed a complete start up of the system, and also completed the validation (document written by OEM).